
6B.6—Substation Grounding
The control cable sheath and parallel ground wire shall be connected together and grounded at the equipment, in the control house or the point of circuit termination, and at any intermediate junction
This reference is intended for preliminary ODN and passive infrastructure research. Topology, split ratio, box or cabinet capacity, closure rating, cable type, test limits and applicable standards must be verified for the specific project.